When I built my system I did it knowing I would be adding more batteries as funds allowed, and I was able to order a 2nd battery yesterday. My question is, will I need to fully charge the 2nd battery before paralleling it with my original (1 month old)? Or go ahead and make the connections, turn...
My "simple" setup is a SunGoldPower 24V 3kW all-in-one (AIO) inverter/charger, and two EG4-LL 24V 200Ah batteries (1 right now, 2nd was ordered yesterday). The not-so-simple part is 2500W of solar. During the day the batteries are charged from solar, and once it's dark and there's not enough...
So how have these setting been working for you? I have a SunGoldPower 24V 3kW, essentially the same as the Chins and PowMR, just dressed in different clothes. :LOL:
I'm sure this is a simple answer, but I've probably overthought it to the point that I'm now confusing myself. :LOL:
I have a SunGoldPower 3kW/24V inverter charger. I operate it as a battery backup, so the inverter only comes on when the mains go down. I also have 2500 watts of solar connected...
Going through the manual for the SGP 24V/3kW all-in-one, for the "AC input wire diameter and switch" they recommend:
Am I to read that as needing a 2P 40A breaker in the mains panel that supplies the AC input to the all-in-one? On the AC output they recommend the same, and I often see people...