Calling all Megarevo owners.
Seems like the other thread has been disabled? So I would like to start a thread to discuss or most important help each other out with problems, programming, or general.
I want to start by asking about how the CT works to keep from back feeding the grid? Looking at...
I am about to pull my hair out and I am bald. Need help reading specifications on some DC breakers. I am wanting a PV disconnect at the array and inside. 300vdc 12 ISC/11.94 VMP.
I think I can wrap head around single pole. But double pole I am unsure about. 500vdc 16 amp/2 is what I have found...
I have been studying about east/west facing arrays. For me I have settled that an Eastern array would be advantageous, ground mount. In running the simulations it appears that having them on an adjustable AZ may be beneficial. Initial thoughts were to go 45* each side of 180 (135 for East and...
When running one pack (master) the function worked as it should, and continued after adding the second pack.. But the second pack (pack 1), stays in the "intermittent waiting" mode and does not go into discharge mode. I did turn off the function in the menu and bypassed the function to get it...
I have not seen any warnings anywhere, but don't want to take chance causing harm to the hybrid inverter. I have breaker that ties the main panel and critical load panel together. Of course it is in the off position under normal operation.
But is there an issue to switch it on before...