Thanks Bob! That's a lot simpler than I had in my mind. I was stuck on running the contactor in parallel to the BMS, thinking it would be used for larger loads.
I was thinking about using the BMS to run the 12V loads and a contactor, that could also be manually shut off, to run a large inverter.