diy solar

diy solar

Recent content by kWhShifter

  1. K

    MPP-SOLAR LV6548

    I still don’t see a way in either the manual, spec sheet or LV6548 software (watchpower, phone app) to set any “rate-shifting” settings... ie: charge batteries only certain off-peak time periods. Web site states “Timer control on AC output and charging” Page 32 of the “SolarPower” software...
  2. K

    >>> Battery Management with MPP Hardware and Third-Party BMS

    Still looking for advice/comments on above.... But, it looks like ICC software can act as middleware between certain MPP units and several BMS systems as described here: https://iccsoftware.co.za/
  3. K

    >>> Battery Management with MPP Hardware and Third-Party BMS

    Cross-Post from "All-In-One-Systems" Can Anyone Confirm The following on the (USA low Voltage) MPP LV5048 Model: 1) Does BATTERY EQUALIZATION actually work? -- I See "Equalization Paramaters" 33-37 in the manual's "setting" description area, page 20 http://www.mppsolar.com/manual/SPLIT PHASE...
  4. K

    >>> LV5048 Battery Equalization and Serial Port Control

    Can Anyone Confirm The following on the (USA low Voltage) LV5048 Model: 1) Does BATTERY EQUALIZATION actually work? -- I See Paramaters 33-37 in the manual's "setting" description area, page 20 http://www.mppsolar.com/manual/SPLIT PHASE LV/LV5048 split phase manual-20191024.pdf -- But I see no...
  5. K

    Problem charging battery with MPP Solar LV5048 inverter

    Can Anyone (Screech_?) Confirm The following on the (USA low Voltage) LV5048 Model: 1) Does BATTERY EQUALIZATION actually work? -- I See Paramaters 33-37 in the manual's "setting" description area, page 20...
  6. K

    >>> TimeShifting an MPP LV5048

    Just to close out this thread: I know it may seem obvious/trivial-- The "SolarPower" software package will NOT monitor/control the LV5048. Only the "WatchPower" package seems to be available for the LV5048. There is limited subset of settable parameters in the "WatchPower" software. Compare...
  7. K

    mpp lv 5kva-48v not charging from grid

    THNX. Just to wrap-up this off topic bit about the software: The "SolarPower" software package will NOT monitor/control the LV5048. Only the "WatchPower" package seems to be available for the LV5048. I know it may seem obvious/trivial-- But there is limited subset of settable parameters in...
  8. K

    mpp lv 5kva-48v not charging from grid

    Hi.. Thnx. Sorry, this is a bit off topic.... Perhaps Im not being clear enough. Im not interested in the firmware version. I just want to know what software is shipping with the unit. In other words: What CD(s) came with the unit-- Does the label on the CD that came with the unit say...
  9. K

    mpp lv 5kva-48v not charging from grid

    Can anyone on this thread confirm which software package(s) the LV5048 comes with? Thats the non-hybrid unit, as described in the first post in this thread. Does the unit come with the SolarPower software package? -or- Only the WatchPower software package? -or- Perhaps both? Thnx.
  10. K

    >>> TimeShifting an MPP LV5048

    So I think it is still unclear whether the 5048 model has a time/cost-shifting setting in the shipping software. I have seen ads on eBay (4/2020) for the 5048 which seem to show that the "SolarPower" software application DOES ship with the latest production units. If this is the case, then the...
  11. K

    >>> Time Shifting an MPP LV2424

    Erik, in post "MPP Solar LV2424 kicks butt!!!," confirms that the LV2424 SolarPower software does time/cost-shifting in the "Off-Peak Duration" setting. Thnx Erik.
  12. K

    MPP Solar LV2424 kicks butt!!!

    THANKS for the confirmation! Good Luck.
  13. K

    MPP Solar LV2424 kicks butt!!!

    Erik-- Can you PLEASE confirm the following on the LV2424 unit...thnx. There seems to be two different software packages for the All-In-One MPP units: 1) LV5048 -- WatchPower software 2) LV2424 -- SolarPower software As I glance at both manuals-- They are a bit different and several...
  14. K

    >>> Time Shifting an MPP LV2424

    Cross post for LV2424 users eyes, thnx. There seems to be two different software packages for the MPP units: 1) LV5048 -- WatchPower software -- Looks like there are no Time Shifting Settings 2) LV2424 -- SolarPower software -- "Off-Peak Duration" parameter setting The online documentation is...
  15. K

    >>> TimeShifting an MPP LV5048

    There seems to be two different software packages for the MPP units: 1) LV5048 -- WatchPower software -- Looks like there are no Time Shifting Settings 2) LV2424 -- SolarPower software -- "Off-Peak Duration" parameter setting The documentation is a bit unclear on the "Off-Peak Duration"...