I have a 6.3kW Solar system connected to a Solaredge Inverter to a Tesla Gateway to Powerwall 2 to Load/grid with a 5kW export level all managed by the CT-Harvi and Eddi management system
I am planning to add a 10 kW Vertical wind turbine to this system.
I am happy with the Solar system during...