I worked for a power company producing electricity at a generating station. The power house is the place the boilers, turbines and
generators are located that produce the power that goes out on the grid.
I HAVE 2 GROWATT SPF5000 ES CHARGE CONTROLLERS, A 5KW MIDPOINT TRANSFORMER AND 3 LIFE POWER 4 -51.2 VOLT IN A RACK. IM BUILDING A SMALL CABIN IN THE WOODS AND WOULD LIKE TO BE ABLE TO CHARGE THE BATTERIES WITH A GENERATOR UNTIL MY SOLAR ARRAY IS COMPLETED. DOES ANYONE HAVE A WIRING DIAGRAM THEY...
Sorry for offending you. 42 years at a powerhouse that requires cap locks on all interactions. Retired now and need some adjusting back to normal.
Thanks for the info though. It is appreciated.