The client aims to power various loads using the solar PV system during both day and night.
The day is divided into three time periods:
Off-peak time: 8 AM to 5 PM
Peak time: 5 PM to 10 PM
Off-peak time: 10 PM to 8 AM
The load distribution throughout the day includes the following:
AC 1.5 ton...