I have a grid tied system. When first installed we had net-metering. Since then the local utility has changed the game. Thank you for your response. I will check to see if my current inverter will accommodate the revised scenario.
The difference between what my local utility pays for my solar and what they charge me for using it is too much. I would like to do a solar/battery system that uses the grid as back up. I’ve been told I may be able to use the type of automatic transfer switch which is typically used for a backup...