I’m not sure if I’m supposed to post links so I’ll just leave the model number of the panels.
BSM700PMB6-70SDC
They’re “manufactured” by bluesun I’m not sure if they’re the original or not.
So I have a basic understanding of how the wiring would work for 4-8 panels..
But what about 100-200 panels?
How are the larger arrays wired?
Surely each row of 10-20 panels are combined with a combinder box but then how do you wire up 10 of those?
How should a completely off grid system be grounded? I tried doing my own research but it seems like there’s ton of contradicting information. Two 6000XP’s will be energizing the main panel. Also this is a metal building.