1) Anyone interested in installing their own GRID-TIED Solar Photovoltaic system but are put off by the permitting process...it's not as difficult as you may think.
I have recently completed a permit packet for Southwestern Florida where "owner-builder permitting" is allowed. If you are...
University.Enphase.com
You will need an enlighten login.
Certification is required by Enphase to initialize a system that has batteries or the IQ Controller.
If you already have an enphase system you can log in with the same credentials.
Please follow link for insights to installing the enphase ensemble system from a veteran installer
https://runonsun.solar/~runons5/blogs/blog1.php/solworks/est/hands-on-ensemble-my-trip-to-enphase
From FPL Net metering application page. "The system production is larger than your annual energy usage. The system size must be reduced prior to FPL approval."