diy solar

diy solar

Search results

  1. G

    Do I Need Automatic Transfer switch

    Automatic transfer switch Finishing up Solar upgrade on 2022 Rockwood Roo 235S Now have 4 200 W panels on camper, (have room for 2 more panels, in future) 85 Victron Mppt controller, Battery Shutt, 2 LiTime 230Ah batteries. 1000W inverter. Generator as needed Boondocking 3-4 days at a time...
  2. G

    Having trouble selecting MPPT Controller

    Having trouble selecting MPPT Controller Have 4-200W panel on RV roof, wired series/ parallel, will add 2-200 more in future when more money avaible 1 230 Ah li time battery, will add second in future 1000 inverter, not used, but will upgrade someday These upgrades have gotten a little pricey...
  3. G

    Upgrade RV factory installed system

    Last year I purchased new a 2022 Forest river Rockwood ROO 235S. The camper came with one 200 W solar panel, the dealer, added a second panel. We believe they are go power but no tags. The solar controller is a go power GP-PWM – 30 –U L The inverter is a WFCO 1000 W models WF 5110 RS pure side...
  4. G

    Upgrade RV factory installed system

    Last year I purchased new a 2022 Forest river Rockwood ROO 235S. The camper came factory installed with one 200 W solar panel, the dealer, added a second panel. We believe they are go power but no labels The solar controller is a Go power GP-PWM – 30 –U L The inverter is a WFCO 1000 W models WF...
Back
Top