Hello,
I'm installing an EP Cube Hybrid system to protect an entire load panel. I hired an electrician to run the wiring and the image is what they are proposing to do. I want the gateway to control when I pull from the grid. From the electricians diagram, wouldn't the tap allow the load panel...