In my travel trailer I'm in the process of installing 3 105 A-hr LiFP batteries and a 3 KW Victron Multi-plus inverter charged from 500 W of PVs controlled by a Victron 100/50 MPPT. The LiFP batteries, ect. will be about 20 ft from the existing batteries up front. I'm wondering if it is...