Hi all
I now have two 200A Seplos BMS, each with 16 280Ah Eve cells.
DIP switches are set as per the manual, ie pack 0 is all off except sw 5, pack 1 only has sw 1 on.
Pack 0 has Victron/SMA protocol selected
Pack 0 and 1 are interconnected with a standard RJ45 patch cable
CAN cable is...