Hi,
I think this is a basic detail that gets passed over quickly, but I'm a bit confused.
I have 2 lv6548 that will be used in split phase mode, and i plan to use bypass as well with AC input. I plan to use a critical loads panel that is directly connected to my 3 pole double throw switch...