diy solar

diy solar

Most reacted threads

  • 30 ft of 4/0 copper welding cable length from batteries to inverter?

    its expensive but, my system design requires batteries to be on other side of garage from the inverter and transfer switch which is a total of 30 ft total cable length run thru soffit to a distribution block for the battery rack. I understand ideally batteries should be closer to the inverter...

diy solar

diy solar
Back
Top