They added battery because the system is in California, where net metering value went down by 75% for new systems, and Time of use rate...
-
C
So a hybrid pv system always have 2 inverters where 1 of them would act as the grid so the other inverter thinks it is always connected...
-
C
I got a quote from contractor , $65k for a 16.94kw pv system with 20kWh battery.
They messed up the inverter in the quote since the...
-