I am trying to beat the deadline to get in under NEM 2.0. However, even if they did away with the net metering I would still want to go solar. The payback period for me is worth it. I am heading towards retirement and the last thing I need is for SCE to continue to raise rates on me. I am tired...
I am looking at the non-export form right now (14-732). My system will be in this week. I still intend to try and go for NEM 2.0 as that would be better than the proposed new 3.0. But I wonder if non-export would be better than the hassle and fees of the proposed NEM 3.0.
I will have batteries...
I am purchasing 45 Canadian Solar 400w panels for a grid tie ground mount install. The full array will be 200 ft. from my meter with no shade concerns. If I just want to get the system in and connected to the grid, what would be my best option for inverters?
Would it be best to go...
YA, the permit is easy and there are many who will help with that. I think I looked at the PG&E application and it was easier than SCE. SCE is such a pain to work with.
Many utilities in CA have a one page application even for over 10kw systems.
I am trying to complete the utility (SCE in California) Net-metering application. This will be a self-install project.
Has anyone completed the application themselves? There are no resources online for completing the application. The only questions I have left are below. I beleive they want...