Tech on fri put the system on lead acid and its running off voltage....but i have 7 lifepower and a 14 kwh 280 ah 48 volt pack added also another 200ah battery.....
I have 3 units installed and all 6 strings almost max out but im clipping at140 amps! And all three bypass to grid if load goes over 6000 watts. Tech support is buzy.