diy solar

diy solar

Most reacted threads

  • Off-grid calculation-Pakistan

    The client aims to power various loads using the solar PV system during both day and night. The day is divided into three time periods: Off-peak time: 8 AM to 5 PM Peak time: 5 PM to 10 PM Off-peak time: 10 PM to 8 AM The load distribution throughout the day includes the following: AC 1.5 ton...
Back
Top