  1. S

    DER storage meter wiring with solark

    I am changing my battery storage from the tesla powerwall 2 that came with my system and adding to the ruixu battery storage I installed with the solark assuming I can figure this out. SRP has a DER storage meter which per the DER rep at SRP only sees if the system is charging or discharging...
  2. S

    10 panel support structure question

    I am looking to finalize the last 10 panels that are to be added to my system. was considering building a T post style structure to support the remaining 10 panels. Was considering 4x4 steel uprights and an I-beam square box up top to mount the rails to. has anyone built something similar I am...
  3. S

    working as designed... not as intended

    finally got my solark 15k system up and running. my previous enphase system with tesla battery is running through the AC coupled side and its REALLY not happy to be there. the tesla gateway 2 thinks its offgrid (confirmed with Solark this is a known issue and no fix available) and those solar...
  4. S

    tesla Powerwall 2 with gateway 2.

    the tesla system is not liking to be ac coupled through my solark so gauging interest in parting with this. Im open to discussions on shipping I have pallets available to pack for shipping if necessary. shipping will be the responsibility of purchaser to arrange pickup. Located in Phoenix AZ...
  5. S

    need a breaker square D homeline with up to 3/0 wire

    I was incorrect that a breaker was available with a 3/0 post. up to 100a breakers only have a 2/0 max post. any suggestions on fixing this issue. its going into a simens solar ready panel that came with a 70A solar breaker and will accept up to 100A breaker. I do not need more than then 70A but...
  6. S

    inxeption vendor?

    Has anyone used this vendor or have any reviews? their pricing seems almost too good to be true.
  7. S

    mounting over roof vents and plumbing vents

    I read though some code p3103.1 that now allows for installation over plumbing vents as long as there is enough spacing between the top of the vent and the panel and now the vents can be cut to 2" above the roof line. I will likely reroute these to go out the top of the panels so I dont have...
  8. S

    400a main panel needed?

    first of likely many questions with this project of adding to my existing system. I currently have 20 rec370 panels on iq7+ inverters (30.25a) and a 200a solar ready main panel with a 70a breaker on the solar. I am going to add 31 455w panels on iq7A inverters (44.95a) all will go to the same...