Hi all
I wonder if it's possible to setup my Deye 8K to have a minimum 50w being exported continuously ? I just want to avoid, as much as I possibly can, the importing of any power during my higher tariff hours (5am right around to 2am - cheap rate from 2am to 5am)
I currently have a constant 20w - 30w or so import all day (when load exceeds generation) and night. I have plenty of battery capacity. I constant 20w - 30w adds up over the month.
I previously had a Sofar ME3000, which had the ability to set a CT Offset value, which worked perfectly in tricking the ME3000 to "think" it was exporting Zero, but it was actually exporting 30w
Is there maybe a secret engineering menu to set a CT Offset ?
I wonder if it's possible to setup my Deye 8K to have a minimum 50w being exported continuously ? I just want to avoid, as much as I possibly can, the importing of any power during my higher tariff hours (5am right around to 2am - cheap rate from 2am to 5am)
I currently have a constant 20w - 30w or so import all day (when load exceeds generation) and night. I have plenty of battery capacity. I constant 20w - 30w adds up over the month.
I previously had a Sofar ME3000, which had the ability to set a CT Offset value, which worked perfectly in tricking the ME3000 to "think" it was exporting Zero, but it was actually exporting 30w
Is there maybe a secret engineering menu to set a CT Offset ?