44bburgess
New Member
- Joined
- Jan 6, 2021
- Messages
- 6
I have 2 LV6548 systems configured for s split phase configuration. I have 28 12v/200ah gel batteries configured for 3s/16p. shutoff voltage is 46.4v and max charge is 56.4v. The batteries only last for a couple of hours. What am I doing wrong? I seem to be drawing 30kwh at night. I though I had I had 3800ah of batteries.