Ill have a pair of 5KW (245VDC @ 20amp) DC circuits feeding the 2 MPPTs on my Solark. The panels will be on the roof. Now, this is a new home build and the AC mains entry is underground to the side of the house where the meter is, then through the brick into the garage where the mains panel is.
I really dont want a hole in the roof... now the panels will butt down nearly to the eave, is it "code" to just have the cables fall over the eave and then down the wall to an entry box that delivers the cables into the garage where the solark will be?