SHTF Power Anyway
Power Pig
I was planning on installing a 10 kwh system on a barn with a metal roof with an underground feed to a nearby shop for use off-grid. I was told by one installer that I didn't need permits. I was sold a full system without discussion of any rapid shutdown necessities. I spoke with another installer who said it was required on any roof. I'm confused. I do not want to add to the complexity of our build but do not want to be unsafe. Thoughts? I'm in Washington state if that helps. If I need it, what systems do you recommend and why?