Neil H
New Member
I have s problem with parallel connecting two Goodwe GW6000D-ES-20
I have set up the master and slave
(the master works fine on its own)
I conect the coms cable between the two invertors and they seem to be taking to each other ok
the problem I'm having is that as soon as I conect them I lose the conection to the smart meter
I have set up the master and slave
(the master works fine on its own)
I conect the coms cable between the two invertors and they seem to be taking to each other ok
the problem I'm having is that as soon as I conect them I lose the conection to the smart meter
Last edited: