Brett V
Mad Scientist
Shenzen Yidong
I'm planning to replace a stack of 180 ah AGM batteries configured in an 2S4P (I know too many strings, it's been a learning experience) with 16 of these 200 ah cells configured in a 2P8S configuration. My application is a home built Frankenstein UPS for the essentials... freezers, fridge, a few lights all off a 1500 watt 2 volt inverter. My average drain over 10 hours expected run time is about 25 amps. I have spent 40 years in the telecommunications industry and the plastic case of the CALB cells appeals to me more than the aluminum with blue shrink wrap I see most are using. My goal is to upgrade the batteries and charger, then forget about them. I'm open to suggestions...
I'm planning to replace a stack of 180 ah AGM batteries configured in an 2S4P (I know too many strings, it's been a learning experience) with 16 of these 200 ah cells configured in a 2P8S configuration. My application is a home built Frankenstein UPS for the essentials... freezers, fridge, a few lights all off a 1500 watt 2 volt inverter. My average drain over 10 hours expected run time is about 25 amps. I have spent 40 years in the telecommunications industry and the plastic case of the CALB cells appeals to me more than the aluminum with blue shrink wrap I see most are using. My goal is to upgrade the batteries and charger, then forget about them. I'm open to suggestions...