NorthTown2022
New Member
I am currently commissioning a Quattro 48/5000/70 single phase unit and a 280ah home made battery before moving everything to a cabin in the woods.
The only thing hooked into the L1 out are three recepticals with NO load and a lightning arrestor (which was removed for testing purposes).
The draw only appears while charging battery with temporary AC power I have wired in from my main service panel.
There is no PV hooked up yet.
Any thoughts on this?
@John Frum
@sunshine_eggo
The only thing hooked into the L1 out are three recepticals with NO load and a lightning arrestor (which was removed for testing purposes).
The draw only appears while charging battery with temporary AC power I have wired in from my main service panel.
There is no PV hooked up yet.
Any thoughts on this?
@John Frum
@sunshine_eggo