Hello,
I've just connected 3 Voltronic MAX 8K inverters in 3 phase configuration and planned maximizing self-consumption using 40kWh LFP battery. I need to switch SBU to Utility first and back depending on time of day (tariff) and battery state of charge.
How big was my surprise when I found out that during the switchover at best all lights turn off and back on, some appliances enter a broken state (my coffee machine needing unplugging and plugging back in, AC turning off) to in worse cases (50% of the time) it taking 2-3 sec with no power. So Utility Mode... no output for 3 sec.... SBU. What am I doing wrong? Evey now and then the switching happens in a completely smooth way without me noticing. I think it happens with inverters switching on their own based on internal state and not me switching output priority (I may be wrong).
The big thing is that I was planning to switch few times (not strictly based on 15 min price to reduce wear) a day as dynamic tariffs are about to be introduced in my country in a month.
I have a software engineering background so automating things and integrating them is not a challenge.
I've just connected 3 Voltronic MAX 8K inverters in 3 phase configuration and planned maximizing self-consumption using 40kWh LFP battery. I need to switch SBU to Utility first and back depending on time of day (tariff) and battery state of charge.
How big was my surprise when I found out that during the switchover at best all lights turn off and back on, some appliances enter a broken state (my coffee machine needing unplugging and plugging back in, AC turning off) to in worse cases (50% of the time) it taking 2-3 sec with no power. So Utility Mode... no output for 3 sec.... SBU. What am I doing wrong? Evey now and then the switching happens in a completely smooth way without me noticing. I think it happens with inverters switching on their own based on internal state and not me switching output priority (I may be wrong).
The big thing is that I was planning to switch few times (not strictly based on 15 min price to reduce wear) a day as dynamic tariffs are about to be introduced in my country in a month.
I have a software engineering background so automating things and integrating them is not a challenge.
Last edited: