I am about to order either 12 or 16 3.2v 280 ah cells to replace my current lead acid system (2x 8ds and a starter battery). My plan was to make 4 separate 12v packs with their own 200 amp jbd bms. Then run these parallel into a busbar to power my system. I was about to order from Amy wan and she tells me I shouldn’t do this. I should run one bms and have one 12v bank. I like the redundancy of have multiple banks. I figure at this point the max power I am going to pull at once is 3000 watts. Planning a Victron 3000w charger inverter. Does anyone have any suggestions? Can I do it this way or is there a better way?My plan is to over build the system so I can add things to it later and have lots of redundancy. I have a wind generator and a couple solar panels but will be adding as many solar panels as I can fit.
Thanks in advance