I should add ... we have had lightning strike across the street close enough to get some metal going sparky via induction in places on...
-
C
I have:
PV String 1 > MN 600 > SPD > SB ( repeat for all 3 strings)
All panels EGC > MN box > SB chassis
SB emergency Power port EGC...
-
C
If Rule-21, I suppose this is a Sunny Boy -41 series.
I've only plugged that in with L1/N/L2 connection, haven't tried L1/L2 only.
So...
-
C
I don't think firmware is documented. or debugged, or regression tested.
Nope, because you don't have a Neutral (wire) :)
All you...
-
C
bridging N tro the SB Frame ground worked for Island mode
Now I need to get my "third" wire over to this thing. Just noticed I never...
-
C
I can see nothing in the documentation stating Island 60Hz requires N :/
I do have an EGC I could tie to Neutral but isn't that...
-
C
Looking at settings.
I see "Start point of the power control via frequency" which is 1.00 and End is set to 2.00, is this what you were...
-
C
Set to island 60hz, 103 error ... set ac side voltage / grid voltage to 240 but no dice.
I have 2 wires going to this unit which provide...
-
C
Going to have to request grid guard code, it is indeed setup as rule 21.
-