Ok, so in the potential above scenario, where and N/G bond is on grid panel (with L1, L2 and Ground connected to AC in) and on AC output (N/G bond at the shed panel), is that a “hesitant thumbs up for safety”, or is it still a no-no because of the double N/G bonded panels?
Also, is it only...