Hello all,
I'm having difficulty getting hold of my solar contractor, so going to look to the forum for help. System circa 2007.
I have a 4 conductor cable running from panels to the building (60 meters) which houses the Charge controller, inverter, 1300AH SLA batteries, and other gear.
I...