diy solar

diy solar

Search results

  1. Nabil Gebrael

    International, Sharing Solar Panel installation with 2 inverters (3 phase and 1 phase) off grid.

    so can 2 mppt be connected to the same PV array? will it be a problem if the MPPT is connect to a PV array much larger than its capacity? any device to regulate and protect the MPPT?
  2. Nabil Gebrael

    International, Sharing Solar Panel installation with 2 inverters (3 phase and 1 phase) off grid.

    by the way. i love NC . I lived and worked in Raleigh for 10 years. I visit twice a year from overseas.
  3. Nabil Gebrael

    International, Sharing Solar Panel installation with 2 inverters (3 phase and 1 phase) off grid.

    Will it work in a parallel mode (on the Panel DC Side). the inverter needing power will just consume it and distribute it to the appropriate load.
  4. Nabil Gebrael

    International, Sharing Solar Panel installation with 2 inverters (3 phase and 1 phase) off grid.

    A challenge to the smart ones. Is there a way to share the DC power output of an installation of many PV panels (i.e. 100,000 watts), between 2 inverters or more. I prefer not to split the panels into 2 arrays one for each. My need: - One load requires a 3 phase inverter (30kw). This 3phase...
  5. Nabil Gebrael

    Building a small factory LiFePo4 in Beirut

    I will start contacting these cell manufacturers. What are the components that I should be buying? Bms, What else? Thanks N.
  6. Nabil Gebrael

    Building a small factory LiFePo4 in Beirut

    Urgency. 1. The fuel subsidy for the power generation companies will be lifted soon, within a year or two. Price of electricity will become much higher. Easily 5 to 10 times the cost of today. 2. Unless we have a one-sided government. One dominant political party in control, the arguing...
  7. Nabil Gebrael

    Building a small factory LiFePo4 in Beirut

    Assembling. Since shipping takes a long time. I can ship all the components that I need to build 12v 24v 48v, and here I can build I don't know anything about recycling lead acid battery. I will look into it. And videos to watch. I quickly and as needed. We have a major electric power...
  8. Nabil Gebrael

    Building a small factory LiFePo4 in Beirut

    Assembling. Since shipping takes a long time. I can ship all the components that I need to build 12v 24v 48v, and here I can build them quickly and as needed. We have a major electric power urgency coming upon us. And I need to move fast. Thanks
  9. Nabil Gebrael

    Building a small factory LiFePo4 in Beirut

    1st of All, Thank you Will Prowse. I enjoyed your well informative videos. I am a business man on a mission to build solar systems for poorer small homes in Beirut Lebanon , the people who needs it the most. I want to keep the cost to a minimum, so I am wondering if I can save money by...
Back
Top