I'm working on calculating the loads, I'm ordering an Emporia Vue soon to dial it in. I currently run these loads of a 5300w generator though. 1.5HP well pump, refrigerator, lights, internet. Just backing up a critical loads panel, not the whole house. It does need to be UL listed.