agarg
New Member
Folks
The first pdf shows that I have my ESS inside the garage, the main meter on the north side and then I am putting combiner box, ESS Disconnect (DC disconnect and inverter disconnect) outside within 5 ft of the ESS (that is the city requirement).
There is very little space on that wall (about 8 ft high x 18 inch wide).
I have mounted
The first picture is satellite image just making an illustration of what is where.
The second one shows the place boxes are mounted minus the conduits (planning tomorrow).
Is there anything that stands out as wrong or red flag. Appreciate a feedback.
The first pdf shows that I have my ESS inside the garage, the main meter on the north side and then I am putting combiner box, ESS Disconnect (DC disconnect and inverter disconnect) outside within 5 ft of the ESS (that is the city requirement).
There is very little space on that wall (about 8 ft high x 18 inch wide).
I have mounted
- A combiner box (which as a rapid shutdown -- essentially a breaker to disconnect power to micro to kill supplies from them)
- In the same box I have 4 MOCP of 20 amps for each of the array
- I have a Inverter disconnect (a 60 amp knife disconnect)
- Yet to mount a IMO DC disconnect which I await but illustrate the location
- Unrelated box -- An HVAC disconnect at the bottom.
The first picture is satellite image just making an illustration of what is where.
The second one shows the place boxes are mounted minus the conduits (planning tomorrow).
Is there anything that stands out as wrong or red flag. Appreciate a feedback.