I have 3 circuit branches and solar panels on 4 different roof sections.
I'm trying to plan out the details of the junction boxes, conduit runs, and wire transitions and could use some help!
Attached are a few images showing what I was initially thinking with the conduit runs.
The junction boxes would transition from the 10 gauge tray cable to 10 gauge thwn-2. Each branch would have 3 wires so the total would be 9 wires, 6 that are conducting (the other 3 would be ground)
Branch 1 & 2 are on a 30 amp breaker. Branch 3 is on a 15 amp breaker.
Any problems with this setup? Or perhaps any way to make it better?
I'm trying to plan out the details of the junction boxes, conduit runs, and wire transitions and could use some help!
Attached are a few images showing what I was initially thinking with the conduit runs.
The junction boxes would transition from the 10 gauge tray cable to 10 gauge thwn-2. Each branch would have 3 wires so the total would be 9 wires, 6 that are conducting (the other 3 would be ground)
Branch 1 & 2 are on a 30 amp breaker. Branch 3 is on a 15 amp breaker.
Any problems with this setup? Or perhaps any way to make it better?