Is the main service panel you refer to where I currently have the transformer breaker,grid breaker, and inverter ac in breaker from transfer switch.Ok this would allow grid to be used with nuetral and ground again. As it is transformer is necessary when operating grid only. This solves my future plan for mpp inverter install that needs nuetral. It will be in seperate load panel feeding ac units only.
I hope I understand that the main service panel is the breaker at the grid meter?
Thank you very much for your time. I will study and redraw layout to make sure I am understanding.
Last edited: