Hello,
I am planning a grit-tied solar system with battery.
The inverter should only deliver energy to the grit when the battery is full.
Do i have to install the inverter at the start if the system (drawing A) or can it be installed any where in the electrical system (drawing B)?
The reason i ask is because the grit enters at the house, and the solar pannels wil be at the garage.
If the inverter has to be at the beginning of the system i need an extra cable from the house to the garage ?.
Thank's ?