diy solar

diy solar

Optimizer + Multiple String

ragnakore

New Member
Joined
Feb 2, 2023
Messages
5
Location
Quezon City
I have East, South and West roofs. Obviously I should not string my panels into a single string.
So I thought of installing 3 strings. Unfortunately, my MPPT cannot accommodate the current.

1693466358133.png
A friend suggested installing a Current Limiter before entering the MPPT.
The only purpose-built current limiter would be an Optimizer as shown.

Your opinion: Good idea? Bad Idea?

Thanks.
 
No need for a current limiter.
The SCC will only draw what it needs.
Voltage is pushed, but current must be drawn.
 
Back
Top