I have East, South and West roofs. Obviously I should not string my panels into a single string.
So I thought of installing 3 strings. Unfortunately, my MPPT cannot accommodate the current.
A friend suggested installing a Current Limiter before entering the MPPT.
The only purpose-built current limiter would be an Optimizer as shown.
Your opinion: Good idea? Bad Idea?
Thanks.