Phase 1 was a Sol-Ark 15k, some batteries, and a small 2kW array.
This will take quite some time yet, but I'm happy that phase 2 is started. I have a full pallet of REC Pure-R 420s that was delivered today seemingly without incident. Good job local FedEx freight and NAZ solar.
Just submitted an interconnect agreement, and should be ordering the mount in a day or two when MT Solar engineering is done figuring out some details.
Had to ask the delivery driver to wait while I pulled the top of the packaging off and checked out some panels. Thanks to people submitting the good and the bad stories on this forum, we are all a little more knowledgeable.
I'll post some on here as progress is made, as a record.
![REC Panels.jpg REC Panels.jpg](https://diysolarforum.com/data/attachments/221/221437-f7fbf6bb650db99950112fe95fc2d290.jpg)
This will take quite some time yet, but I'm happy that phase 2 is started. I have a full pallet of REC Pure-R 420s that was delivered today seemingly without incident. Good job local FedEx freight and NAZ solar.
Just submitted an interconnect agreement, and should be ordering the mount in a day or two when MT Solar engineering is done figuring out some details.
Had to ask the delivery driver to wait while I pulled the top of the packaging off and checked out some panels. Thanks to people submitting the good and the bad stories on this forum, we are all a little more knowledgeable.
I'll post some on here as progress is made, as a record.
![REC Panels.jpg REC Panels.jpg](https://diysolarforum.com/data/attachments/221/221437-f7fbf6bb650db99950112fe95fc2d290.jpg)