Just finished a 16s2p 580ah EVE LF280K battery pack. It will be powering a Growatt 12kW Split Phase Off-Grid Inverter. The battery pack has been lightly tested and everything seems to be working as it should. I have 2x 160a DC circuit breakers on each positive lead (that also act as my main battery disconnects) and will still be installing a 300a Class-T Fuse on the main 4/0 gauge battery cable before the inverter. All cables are 2/0 gauge before the main bus bars and I will be using 4/0 from those to the inverter. I oversized everything, including 500a Daly BMS's and all components are attached to cement board. The smaller bus bars are rated for 300a and the larger main bus bars are rated for 500a. Before I put this unit into full operation, I would like some feedback. I've attached a few pictures. Does anyone see any long-term issues with this setup? I do plan to construct a cover to place on top of the battery pack to protect the components. Cheers.