That’s definitely not what I want to hear
Here’s the thing - these systems are remote, off grid installations. It’s impossible for me to babysit a deep cycle process for 14 days. I also can’t bring the whole system down just so I can deep cycle one battery. It really feels like this is a battery malfunction or the result of a poorly designed battery/BMS system. End users should not be required to go through such lengths to get a battery to function properly. It’s also incredibly frustrating to not be able to get reliable support from the vendor or manufacturer.
Anyway - is there any way to complete a deep cycle process with the chargeverter?