Is this ok?
What's the correct order of the installation?
Only thing I'm really sure is that I hook up to the mppt first with the batteries, and at some later point to the PV array.
my PV array is already wired and so is my string box...ready to plug in to the mppt. Oh and the batteries have off buttons.
48V offgrid system
What's the correct order of the installation?
Only thing I'm really sure is that I hook up to the mppt first with the batteries, and at some later point to the PV array.
my PV array is already wired and so is my string box...ready to plug in to the mppt. Oh and the batteries have off buttons.
48V offgrid system