,I hope I can show the ASL11.0 transformer BUT the message come back that the ASL 11.0 transformer is not real and he refund my paypal account immediately when Jack found out . The next production in China is the 30 kw 2 box inverter . He say the ASL 11.0 transformer core come in December 22 and production will start and the new 30kw will be available next year . Sid say in his forum that he is buying a new design transformer and parts for the GS 12kw and still say it is Jack that cause the delay . I think Jack will not ship anything to Sean on December 15 since he is making the production run of his 30 kw inverters .
I know the wifi board is not necessary and the expensive relays may be causing the FETs to blow up with the remote switch . In my bench test of a shut down switch with relay cause a massive voltage spike if shut down the inverter with 7000 watts inductive load running . The massive spike and back EMF blow up the FETs . The Powerjack Power switch will stut down the load first so no voltage spike and then shut down the inverter and save the FETs . It is not a good ideal to modify the PJ inverter power switch . I use the cheap camera to monitor the low battery voltage and go outside to shut down and recharge the battery .
I know the wifi board is not necessary and the expensive relays may be causing the FETs to blow up with the remote switch . In my bench test of a shut down switch with relay cause a massive voltage spike if shut down the inverter with 7000 watts inductive load running . The massive spike and back EMF blow up the FETs . The Powerjack Power switch will stut down the load first so no voltage spike and then shut down the inverter and save the FETs . It is not a good ideal to modify the PJ inverter power switch . I use the cheap camera to monitor the low battery voltage and go outside to shut down and recharge the battery .