jmckee2725
New Member
I’m currently installing the first phase of 35 455w solarever panels in series, 3 strings of 9 and 1 string of 8 panels. I’m almost done with the install and thought it’d probably be a good idea to make sure all connections are good. I currently have 3 of the 4 strings installed with home runs hanging down to the ground with enough slack to make it to my junction box. What are the best tests to achieve this ? First continuity, then voltage while the sun is out ? Any help is appreciated. Thanks