Allow me to clarify this sketch line schematic pv electricity wiring a little further.
In my country, I have two sources of alternating current: a private generator (3-phase system) and a single-phase grid subscription.
I'm installing a single phase inverter to provide power to my home, but the connection coming from the ATS is a three phase electrical cable, therefore we picked the phase with the least load and linked it to the inverter to charge the batteries if AC is present. However, the technician made a mistake and assigned the priority to the solar system rather than the generator.
What is happening is that the AC in breaker is shutting down; could someone please explain why, when we prioritize the ATS to solar and switch on the generator when there is solar, the AC in breaker shuts down?
In my country, I have two sources of alternating current: a private generator (3-phase system) and a single-phase grid subscription.
I'm installing a single phase inverter to provide power to my home, but the connection coming from the ATS is a three phase electrical cable, therefore we picked the phase with the least load and linked it to the inverter to charge the batteries if AC is present. However, the technician made a mistake and assigned the priority to the solar system rather than the generator.
What is happening is that the AC in breaker is shutting down; could someone please explain why, when we prioritize the ATS to solar and switch on the generator when there is solar, the AC in breaker shuts down?