Im planning a possible project and wanting to verify a few things. Im looking into installing (8) SMA inverters 125 to feed a solar field, to produce approx 1mw. Ihave a Main Panel that is 1600 amp 277/480 panel going to feed all (8) inverters per breaker of 150 amp per inverter, my question can i run all (8) inverters parallel feed or just few at a time or need to run one per branch breaker? mainly looking to arrange wire purchase, Just incase the the main transformer on slab is 1500v 277/480, incase there was a question before the discoonect of the main panel. Thx folks!!