This post is not in a language I understand.
You have not said what functionality you are trying to achieve.
The most important thing to clarify is whether you are allowed to export power to grid or not.
Assuming you can export power to grid but your desire is to do so only when there is no alternative (loads being powered and battery fully charged), there are three settings you need to use:
Parameter 01: set to SBU (inverter priority).
Parameter 04: set to the low battery voltage you want the inverter to stop using battery energy and instead start using grid energy (and any solar energy to recharge the battery).
Parameter 05: set to the battery recharged voltage you want the inverter to switch back from grid priority to SBU (inverter priority).
You will also need to set the right battery type and desired voltages, but that should be straightforward.