So I got sunpower shingle perc panels from the manufacturer.. I got them to custom make me some that will
fit my dimensions and requirements..
So I was watching a video and a guy had 3 victron mttp for his custom hybrid caravan. He had 1 for an external solar blanket
and 2 for his roof solar.. which 1 was 100/50 for 2 panels, 100/30 for 1 panel and 100/30 for external..
So I was thinking is it better to have 1 mttp for each panel or have 1 mttp for all the panels.. Mainly because if it was 1 mttp per panel
then you can't do series or parallel.. But is it better to go with multiple mttp over 1 mttp for the roof solar?
fit my dimensions and requirements..
So I was watching a video and a guy had 3 victron mttp for his custom hybrid caravan. He had 1 for an external solar blanket
and 2 for his roof solar.. which 1 was 100/50 for 2 panels, 100/30 for 1 panel and 100/30 for external..
So I was thinking is it better to have 1 mttp for each panel or have 1 mttp for all the panels.. Mainly because if it was 1 mttp per panel
then you can't do series or parallel.. But is it better to go with multiple mttp over 1 mttp for the roof solar?